Requirements for Pond Construction

Construction of Fish Culture Pond

pondconstrution1

A) Criteria of Site Selection

  • Land should have more water holding capacity.
  • Land Should not be more alkaline or acidic.
  • Low lying area are more suitable.
  • Site must have assured water supply.
  • Outlets and Inlets of ponds should be well built.
  • Site should be approachable with road or path.
  • Site must be away from floods affected areas.

B) Permissible parameter of soil & water

Soil :-

  • Sand (%) - 40
  • Silt (%) - 20
  • Clay (%) - 40
  • Organic carbon (%) - 0.5-2.0
  • Available Nitrogen (mg/100gm) - 20-75
  • Available Phosphorous (mg/100gm) - 2 10

Water :-

  • Colour - Light Green
  • Temperature (Degree Centigrade)- 25 - 35
  • Transparency(cm) - 30 - 40
  • pH - 7.0 - 8.6
  • Dissolve Oxygen (mg/lt) - 4 -10
  • Carbon Dioxide (mg/lt) - 3 - 7
  • Total Alkalinity (mg/lt) - 60 - 230
  • Total Nitrogen (mg/lt) - 0.05 -1.5
  • Phosphorous (mg/lt) - 0.05 -7.0
  • Salinity (ppt) - <5
  • Ammonia (ppm) - 0 - 0.1
  • Calcium (ppm) - 75 - 150
  • Chlorine (ppm) - <0.003
  • Total Dissolve solids (ppm) - <80
  • Potassium (ppm) - 0.5 - 10
  • Iron (ppm) - 0.3 - 10

Time Scheduling for Fish Culture in Pond (PERT/CPM)

Event Activity Net Duration Time (Days)
A Identification of site 10
B Formulation of Project (preparation of plan & estimates, Bank loans etc.) 30
C Training in Fish Farming 15
D Construction/Renovation of Pond 45
E Stocking Management (Liming, Manuring, Filling of water, Growth of plankton and stocking of seed) 18
F Soil and Water Analysis Quarterly, After 60 days of seed in the pond.
G Sale of Fingerlings 30 days after stocking of seed
H Trial Netting Every Month
I Partial Harvesting After 150-180 days of Stocking. (10 Jan)
J Final Harvesting & Marketing After 250- 260 days of stocking.
pertchart1

Construction of Prawn Culture Pond

pondconstrution2A - Criteria of Selection of Site

  • Site must be easily approachable with road or path.
  • Site should be free from floods and seepage.
  • Assured water supply system.
  • Arrangement of outlet of water be made.

 abc

 abc

B - Permissible Parameters for Soil & Water

I) Soil :-

  • Texture
    1. Sand (%) - 40
    2. Silt (%) -20
    3. Clay (%) - 40
  • Colour - Blackish brown
  • Moisture (%) - 35-40
  • Water Retention Capacity (%) - 40
  • Total Alkalinity (mg/100gm) - 0-150
  • Total Hardness (mg/100gm) - 50-180
  • Phosphate (mg/100gm) - 0.5-2.0
  • Salinity (ppt) - <5

II) Water :-

  • Temperature (Celsius) - 28-30
  • Dissolved oxygen (mg/lt) - 5-10
  • Visibility (cm) - 35-40
  • pH -7.0-8.5
  • Carbonate (mg/lt) - 30-50
  • Total Alkalinity (mg/lt) - 50-180
  • Total Hardness (mg/lt) - 50-150
  • Conductivity (mohs/cm) - 20-1500
  • Salinity (ppt) - <5
  • BOD (mg/lt) - <30
  • COD (mg/lt) - <40
  • Phytoplankton (nos/lt) - >500
  • Zooplankton (nos/lt) - >500

Time Scheduling for Prawn Culture in Pond

Event Activity Net Time Duration (Days)
A Selection of site & beneficiary 30
B Training & Study Tour 15
C Formulation of Project & Sanction of loan from bank 30
D Construction of Pond & Infrastructure 45
E Nursery pond preparation & Stocking 15
F Stocking of Seed in Grow out of Pond 45
G Trial Netting After 60 days of Stocking of seed
H Soil & water analysis quarterly
I Water exchange Every month after 60 Days of stocking.
J Partial Harvesting After 150 days of Stocking.
K Total Harvesting After 220-245 days of Stocking